Upgrading of Bulk Water Pipeline: Wesbank Reservoir to Malmesbury / Abbotsdale, Phase 2
A listing tells you it exists. This tells you whether to chase it.
awaiting
score
R 10m–R 20m band
value band
closes 9d
closing
PipelinesConstruction
Extracted from source
Issuing entitySwartland Municipality
ReferenceT02.26.27
ValueR 10m–R 20m band · est*
ScopeUpgrading of a bulk water pipeline from Wesbank Reservoir to Malmesbury / Abbotsdale, Phase 2, involving construction works classified under CIDB CE class.
Service linesPipelines, Construction
CIDB required9CE
Closing11 Sept 2026 · closes 9d
Site visit21 Aug 2026compulsory
Province / municipalityWestern Cape · Swartland Municipality
B-BBEE80/20 preference point system; original or certified copies of valid B-BBEE Status Level Verification Certificates required; preference points must be claimed via Annexure MBD 6.1 and paragraph 6.1; Proof of Locality required to claim locality points.
Local contentProof of Locality required to claim points for locality under the 80/20 preference point system.
Fundingunknown
Duration—
* value not disclosed in notice · banded from scope by the reading engine
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.