Greater Orange Farm Phase 3D Water Infrastructure Upgrade and Renewal
A listing tells you it exists. This tells you whether to chase it.
awaiting
score
value unknown
value band
closed
closing
ConstructionPipelinesNRW / metering
Extracted from source
Issuing entityJohannesburg Water SOC Ltd
ReferenceJW14427D
Value—
ScopeWater infrastructure upgrade and renewal project in Orange Farm comprising preliminary and general items, site clearance, pipe trench earthworks, pipe bedding, medium pressure pipeline supply and installation (uPVC/HDPE), erf connections, yard connections, on-property plumbing retrofitting, STS prepayment water meter supply, installation and technical support, and occupational health and safety compliance items, executed via SMME participation over a 21-month construction period.
Service linesConstruction, Pipelines, NRW / metering
CIDB required—
Closing12 Aug 2026 · closed
Site visit—
Province / municipalityGauteng · City of Johannesburg
B-BBEE—
Local content—
Fundingunknown
Duration21 months
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.