The Catchment.Development Bank of Southern Africa (DBSA) · REF —

Appointment of a Service Provider for Purposes of Undertaking a Comprehensive Bankable Feasibility Study for the Required Bulk and Reticulation Infrastructure (Water, Sanitation, Electricity, Waste Management, Roads and Stormwater) for the Nkuna City Smart Town and Adjacent Villages

A listing tells you it exists. This tells you whether to chase it.

awaiting
score
R 1bn–R 1.5bn band
value band
no closing date
closing
ConsultingPipelinesMech / elecConstruction

Extracted from source

Issuing entityDevelopment Bank of Southern Africa (DBSA)
Reference
ValueR 1bn–R 1.5bn band · est*
ScopeComprehensive bankable feasibility study covering review and validation of bulk and reticulation infrastructure works (bulk water pipeline, external road network and related stormwater, bulk electricity supply, and solid waste management) required to service the proposed Nkuna City Smart Town and adjacent villages. Scope focuses on reviewing/benchmarking existing municipal studies and cost estimates rather than new resource, sanitation, or geotechnical investigations, and includes production of the BFI submission, inception report, cost validation and stakeholder engagement over a 12-month programme.
Service linesConsulting, Pipelines, Mech / elec, Construction
CIDB required
Closing
Site visit
Province / municipalityLimpopo · Nkuna City and adjacent villages (participating municipalities)
B-BBEE
Local content
FundingIFISA (Infrastructure Fund/DBSA-linked funding referenced) · unknown
Duration12 months

* value not disclosed in notice · banded from scope by the reading engine

This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.

Where this came from

CLARIFICATION AND RESPONSES - RFP132.2026.pdf· National eTenders portalfirst seen 01 Sept 2026