Development of an Integrated Waste Management Plan (IWMP), Roads and Stormwater Master Plans (RSWMP), Electricity Master Plans (EMP) and a Management Plan to Reduce Non-Revenue Electricity (MPNRE) in support of Enoch Mgijima and Blue Crane Route Local Municipalities
A listing tells you it exists. This tells you whether to chase it.
awaiting
score
value unknown
value band
closes 17d
closing
ConsultingConstructionPipelinesMech / elecbudgeted grant
Extracted from source
Issuing entityDevelopment Bank of Southern Africa Limited
ReferenceRFP145/2026
Value—
ScopeAppointment of a single Professional Service Provider to develop an Integrated Waste Management Plan (IWMP), Roads and Stormwater Master Plan (RSWMP), Electricity Master Plan (EMP), and a Management Plan to Reduce Non-Revenue Electricity (MPNRE) for Enoch Mgijima Local Municipality (IWMP, RSWMP, EMP, MPNRE) and Blue Crane Route Local Municipality (RSWMP, EMP, MPNRE). Scope includes stakeholder engagement, existing situation assessments, asset registers/valuations, future demand assessments, institutional arrangements, project prioritization and cost estimates, funding and implementation arrangements, environmental/public participation, registration of priority projects with MIG/INEP, preparation of detailed designs, workshops, council adoption support, and project close-out reporting.
Service linesConsulting, Construction, Pipelines, Mech / elec
CIDB required—
Closing18 Sept 2026 · closes 17d
Site visit08 Sept 2026compulsory
Province / municipalityEastern Cape · Enoch Mgijima Local Municipality and Blue Crane Route Local Municipality
B-BBEEB-BBEE forms part of preferential procurement evaluation: PPPFA 2022, 80/20 principle - Price (80 points) and B-BBEE (20 points). Original or certified copy of B-BBEE Certificate/Affidavit required with submission.
Local content—
FundingDBSA acting as Programme Implementing Agent (PIA) on behalf of Enoch Mgijima and Blue Crane Route Local Municipalities; projects to be registered with MIG (Municipal Infrastructure Grant) and INEP (Integrated National Electrification Programme) conditional infrastructure grants · budgeted_grant
Duration15 months
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.